GHMC moves on from EESL: New firm takes over LED streetlight project overhaul with Rs 1,720 crore
Hyderabad: SUNIL MUNGARA

Hyderabad
Greater Hyderabad Municipal Corporation (GHMC) has cleared a Rs 1,720.83-crore streetlight maintenance contract with a new private joint venture amid a prolonged financial dispute with Energy Efficiency Services Limited (EESL) over unpaid dues.
In the GHMC’s recent Standing Committee gave green signal to the new firm BAC Infratech Pvt Limited to take up comprehensive Operation & Maintenance of 7.60 lakh LED street lights covered across GHMC, Cyberabad (CMC), and Malkajgiri (MMC) Municipal Corporations.
A total of 7.60 lakh LED streetlights will be distributed among three civic bodies: 3.30 lakh to GHMC, 1.85 lakh to CMC and 2.45 lakh to MMC. Under the Standing Committee’s decision, the new firm must undertake comprehensive operation and maintenance of the lights, CCMS panels and associated infrastructure for 10 years.
The three civic bodies also budgeted Rs 1,720.83 crore, including Rs 747.72 crore from GHMC, Rs 419.16 crore from CMC and Rs 553.95 crore from MMC.
Tussle between GHMC and EESL
In GHMC limits, the EESL contract was signed in 2017 and expired 30/04/2025 for implementation of the LED street lighting project.
Sources in the GHMC told Telangana Today, “Due to non-payment of dues to the EESL, more than 70% of Hyderabad’s LED fixtures, however exceeded their lifespan, causing erratic blinking, daytime burning and complete blackouts across several stretches in GHMC area.”
